228 results found for "steel"

New Contract: The Sammy Ofer Centre
Octatube has been appointed as the steel and glass specialist for the refurbishment of the Old ... and install the project’s exceptional steel and glass package. The architectural ... entrance to the Business School. The glass and steel structure maintains views through the ... 


Glass Atrium Roof Ten Thirty Amstelveen
...by Octatube and Van Rossum. The glass and steel roof consists of a main structure of ... columns. The columns are composed of tapered steel hollow sections that are ... engineering, production and installation of the steel- and glass structure of the atrium roof. ... 


Octatube lezing over Circulair Ontwerpen
...design at the architects seminar of the National Steel Construction Day. The event takes place at ... in contracting, designing and building with steel. A wide variety of activities are planned ... fields of design, conservation and recycling of steel stucture components. The approach is ... 


Certificaten
...(VCA**, ISO 45001 and SCL) ratify each other. Steel parts: CE / UKCA NEN-EN 1090 specifies the ... with NEN-EN 1090 becomes mandatory for all steelworks. Octatube has been certified and ... 


Cardboard
...friendly as well as more economical than steel. Permanent & Sustainable ... constructed from cardboard tubes and recycled steel spheres (Tuballs). Steel columns support ... 


Quattro
...and special nodes. The cast stainless steel Quattro node is an example of a standard ... modular cast iron, welded or pressed steel or cast, welded or pressed stainless steel. ... 


Olympia Canopy
Curved steel arches and zigzag ladder frames are clad with glass panels, create a distinctive ... canopy consists of five large curved structural steel arches, each spanning 22m. Connecting these ... 


Capital C (De Diamantbeurs)
...of the free form of the design, all the parts (steel beams, glass panels, etc.) differ and come ... to be manufactured, the necessary tube-laser cut steel parts were available on the same pallet. We ... together on site in such a short time (8 days, steel construction), you think: wow, there it ...