118 results found for "engineering"

Westerlaan
...ground level. Octatube was responsible for the engineering, production and assembly of the three ... 


Audi Böllinger Höfe
...recent projects in Germany is the engineering, production and installation of a ... 


Yellow Wings
...and Mick Eekhout. After a process of design and engineering, the collaboration resulted in the ... 


Glass Atrium Ten Thirty
...the 1980s. Octatube has been responsible for the engineering, production and installation of the st


Aquadrom
...ventilation hatches have been included. The engineering and production of the ... 


Cablenet facades Market Hall Rotterdam
...in Europe. Octatube signed for the engineering, production, installation and ... 


Valencia Airport
...a horizontal pressure rod). After six months of engineering the terminal was built in only five ... 


Fletcher A2 Hotel
...system, Octatube was able to include the engineering and realization of the inner ...