173 results found for "LED"

Capital C (De Diamantbeurs)
...After all, everything was connected. This led to the idea to automate the design by ... convert the complex basic geometry into a detailed production model. Here you can read more ... method. For example, when a certain assembled element had to be manufactured, the necessary ... 


Hogeschool INHolland
...and companies, each bringing specific knowledge to the process. The Composietenlab and ... with its facade experience and design/build knowledge, was responsible for process control. ... Octatube integrated state-of-the-art knowledge from the faculties of Aeropace Engineering ... 


Prestige Ticketing
...and sections are unique because of the bevelled angle in the roof. Each node - consisting of ... with high precision and holes have been drilled completely computer controlled. The ... All unique prefab elements had to be modelled and produced without flaws. There was no time ... 


Paper Bridge
...a thickness of 19mm. The steps are made of recycled paper and plastic. The structure was ... France. The cardboard structure has been installed and disassembled again several ... 


Urban Space Station
...spring of 2016 Octatube has produced and installed a bespoke steel frame for a temporary art ... 9 arches mounted on top, each of which is compiled of two circular hollow section elements with ... Therefore each tubular section has been rolled with multiple radii and cut in 3D to connect ... 


AFAS Experience Center
...inner laminated pane of 2x8 mm, a 16 mm argon-filled spacer and an outer pane of approximately 10 ... work with separate tubes and nodes that we assembled on site. Where large elements need to be ... dilatation created at the connection is filled with ... 


The Bubble Eindhoven
...glass elevator shaft has been installed last week. The urban master plan of ... firm Tarra. The building is called 'the Bubble'. The design consists of ... shaft. This elevator shaft has been installed last week, after it was previously ... 


Octatube: winner of the‘Supply chain partner of the year’ award!
...health and safety compliance on site, they installed many large units of glass and pre-finished ... forefront. Their Project Manager Corine Dikkers led the way with managing safety for the ... ‘Innovation’: Octatube have installed a complex façade on Tasman House with ...